by Admin | Aug 14, 2022
Together with its co-venture partners, Husky Energy is developing West White Rose with a concrete gravity (CGS) supported wellhead platform. The platform is a fixed drilling rig, which will produce back to the SeaRose FPSO. The project is currently under construction...
by Admin | Aug 14, 2022
The Lower Churchill River Project is one of the most attractive hydroelectric resources in North America. The project’s two sites, Muskrat Falls and Gull Island, have a combined capacity of over 3,000 megawatts. Phase One, the Muskrat Falls Project, includes...
by Admin | Aug 14, 2022
The Hebron Gravity Based Structure was primarily constructed at the Bull Arm Site, Trinity Bay. The structure is 278 meters high, has a 130 metre diameter through the base, weighs 750,000 tonnes and has a living quarters for 220 people. The project is estimated to...
by Admin | Aug 14, 2022
Newfoundland Transshipment Limited (NTL) was formed in 1996 to oversee the construction and operation of a major marine transshipment facility located in Whiffen Head, Placentia Bay. Construction of the Terminal was completed in the fall of 1998 and the operation has...
by Admin | Aug 14, 2022
One of the largest Floating Production Storage and Offloading (FPSO) vessels ever built, the Terra Nova is 292.2 metres long and 45.5 metres wide, approximately the size of three football fields laid end to end. From the keel to the helideck, it stands more than 18...